Post & Beam South-Upper Level
Last inspected: Aug 7, 2024
100
Score
The most recent inspection for Post & Beam South-Upper Level, located at 32 Cambridge St in Charlestown, MA, was conducted on August 7, 2024. This inspection was categorized as low risk, with a score of 100. No violations were recorded during this inspection.
1
Inspections
0
Critical latest
0
Major latest
0
Minor latest
Inspection History
Aug 7, 2024
Routine
No violations found.
100
Violations — Aug 7, 2024 Inspection
No violations recorded for this inspection.
Priority (Critical)
Priority Foundation (Major)
Core (Minor)
Nearby Restaurants