Black Dog Gelato, Llc — Black Dog Gelato

1955 W Belmont Ave, Chicago, IL 60657
Italian
Last inspected: Jun 30, 2017
86
Score
Low Risk

BLACK DOG GELATO, LLC, located at 1955 W Belmont Ave in Chicago, IL, underwent a low-risk inspection on June 30, 2017. This inspection resulted in three minor violations related to food labeling, floor maintenance, and wall/ceiling cleanliness. Across nine scored inspections, the facility has historically maintained a low-risk status.

9
Inspections
0
Critical latest
0
Major latest
3
Minor latest
Inspection History
Jun 30, 2017
Routine
3 minor violations.
86
Aug 24, 2016
Reinspection
1 minor violation.
95
Aug 17, 2016
Routine
2 minor violations.
90
Oct 30, 2015
Routine
2 minor violations.
90
May 29, 2014
Routine
4 minor violations.
82
Jul 19, 2013
Reinspection
4 minor violations.
82
Jul 17, 2013
Routine
5 minor violations.
78
May 18, 2012
Reinspection
4 minor violations.
82
May 17, 2012
License
8 minor violations.
67
Violations — Jun 30, 2017 Inspection
Food in original container, properly labeled: customer advisory posted as needed
Inspector notes: OBSERVED BULK CONTAINER OF SUGAR, IN PREP AREA, WITH NO LABEL. INSTRCD MANAGER THAT BULK CONTAINERS NEED PROPER LABEL. MANAGER CORRECTED ON SITE.
30
Floors: constructed per code, cleaned, good repair, coving installed, dust-less cleaning methods used
Inspector notes: OBSERVED CRACKED TILE IN FRONT OF PREP SINK, WHERE EQUIPMENT HAS GOUGED AN APROXIMATELY, 2 BY 3 INCH HOLE IN TILE AND FLOORING UNDERNEATH. INSTRCD MANAGER TO REPAIR AND REPLACE. OBSERVED GAP WHERE CAULKING IS MISSING, BETWEEN MOP SINK AND FLOOR. INSTRCD MANAGER TO SEAL AREA. OBSERVED DARK DISCOLORED CAULKING ON THE TOP RIGHT CORNER OF THE MOP SINK. INSTRCD MANAGER TO RESEAL. OBSERVED LOOSE PLASTIC COVE STRIP ALONG THE EAST WALL OF THE WALK IN COOLER, WHERE THE WALL AND BASE BOARD MEET. INSTRCD MANAGER TO REPLACE/RESURFACE.
34
Walls, ceilings, attached equipment constructed per code: good repair, surfaces clean and dust-less cleaning methods
Inspector notes: OBSERVED PEELED PAINT ON CEILING IN EMPLOYEE TOILET, NEAR CENTER LIGHT FIXTURE. INSTRCD MANAGER TO RESURFACE AREA, TO ENSURE SMOOTH AND CLEANABLE SURFACE.
35
Priority (Critical)
Priority Foundation (Major)
Core (Minor)